Rocky Mountain Research Station Logo USDA Forest Service
Rocky Mountain Research Station
Forestry Sciences Laboratory - Moscow, Idaho
Moscow Personnel  |  Site Index  |  Site Map  |  Moscow Home
Project Information  |  Modeling Software  |  Library  |  Project Photos  |  Offsite Links  |  Eng. Home

Soil & Water
Engineering Software:


Road Erosion
Fire Effects
Disturbed Forests
Slope Stability
Erosion Modeling
Climate Modeling

Project Leader:
William J. Elliot

Last Revised:

Soil and Water Engineering  >  Library  >  Slope Stability Publications  >  Slope Stability Reference Guide  >  Errata


Slope Stability Reference Guide for National Forests in the United States.
Prellwitz, Koler, Steward, coordinators
Hall, Long, Remboldt, editors

Errata and clarifications sheet

General

New addresses for some authors


Volume I (Sections 1--3)

Inside cover--"...this documents." should be "...this document."

Would be nice to have appendices listed in general table of contents.

p. 13.--"Deterministic Stability Analysis for Road Access (SARA)" should be "Deterministic Stability Analysis for Road Access (DSARA)".

p. 13.--"Hammond, C.J.; D.E. Hall; S.M. Miller; and P.G. Swetik. 1992" should be "Hammond, C.; D. Hall; S. Miller; and P. Swetik. 1992".

p. 96.--Missing heading "References" and one line of text: "Deterministic Level I Stability Analysis (DLISA). 1991. Moscow, ID: U.S."

p. 99.--The erroneous Pf reported for Table 6.2 is for the natural state.

p. 106.--unreadable

p. 244.--Permission to use table 3.2.3 is not indicated clearly.

p. 300.--Text on page marked 300 should be on page 314.

p. 314.--Text on page marked 314 should be on page 300.



Volume II (Sections 4--5)

p. 387.-- Section 4C.2.2.2: "Normally, consolidated clays..." should be "Normally consolidated clays..."

p. 420.-- Figure 4C.25: "After Wineland. Reprinted with permission of Prentice-Hall and ASCE."

p. 421.-- Figure 4C.26: "Reprinted with permission of Prentice-Hall."

p. 720.-- Prellwitz 1988. "77 p." should be "174 p."



Volume III (Section 6)

p. 930.--Retaining Wall Design Guide, new edition: September 1994. EM-7170-14

Appendix 6.7--2 new references for soil nail launching: Application Guide for Launched Soil Nails, Volume 1. July 1994. EM 7170-12A. Washington, DC: U.S. Forest Service. And: Project Report for Launched Soil Nails -- 1992 Demonstration Project. July 1994. EM 7170-12B. Washington, DC: U.S. Forest Service.